Difficulty: Medium
A and B work at rates 3:2 and together finish in 20 days. How long would A take alone?
A 30 days
B 36 days
C 33 1/3 days
D 40 days
Answer: C. 33 1/3 days. A’s rate is 3/5 of the combined rate 1/20, so A works at 3/100 per day.
A takes 12 days and B 18 days. What fraction of the job do they complete together in 4 days?
A 1/3
B 4/9
C 2/3
D 5/9
Answer: D. 5/9. Their daily rate is 1/12+1/18 = 5/36; in 4 days they do 20/36 = 5/9.
A can finish in 15 days and B in 20 days. A works alone for 3 days, then B joins. What is the total time?
A 9 6/7 days
B 8 4/7 days
C 10 days
D 10 6/7 days
Answer: A. 9 6/7 days. A completes 1/5; remaining 4/5 at rate 7/60 takes 48/7 days; total 3+48/7.
Twelve men finish a job in 15 days. After 5 days, 4 men leave. How long does the job take in total?
A 18 days
B 20 days
C 21 days
D 24 days
Answer: B. 20 days. The work is 180 man-days; 60 are done; 120 remain for 8 men, taking 15 more days.
Twenty workers need 12 days. After 4 days, 5 workers leave. Find the total completion time.
A 13 days
B 15 days
C 14 2/3 days
D 16 days
Answer: C. 14 2/3 days. The remaining work is 240−80 = 160 worker-days; 160÷15 = 10 2/3 more days.
Six men or eight women can finish a job in 20 days. How long would 3 men and 4 women take?
A 15 days
B 24 days
C 30 days
D 20 days
Answer: D. 20 days. Three men equal four women; together they equal six men, the stated full team.
A is 40% more efficient than B. If B needs 28 days, how long does A need?
A 20 days
B 18 days
C 22 days
D 24 days
Answer: A. 20 days. A’s rate is 1.4 times B’s; time is 28÷1.4 = 20 days.
A and B together finish in 12 days. B alone takes 20 days. How long does A alone take?
A 24 days
B 30 days
C 32 days
D 36 days
Answer: B. 30 days. A’s rate is 1/12−1/20 = 1/30 per day.
Five men finish a task in 6 days. If one man works as fast as two boys, how long would 10 boys take?
A 5 days
B 8 days
C 6 days
D 10 days
Answer: C. 6 days. Five men equal ten boys; both teams have the same rate.
A, B and C take 30, 45 and 90 days alone. How long do they take together?
A 12 days
B 18 days
C 20 days
D 15 days
Answer: D. 15 days. Their rates add to 1/30+1/45+1/90 = 1/15 per day.
Sixteen men working 6 hours daily finish a job in 24 days. How long would 12 men working 8 hours daily need?
A 24 days
B 18 days
C 20 days
D 30 days
Answer: A. 24 days. Both teams provide 96 worker-hours daily, so the duration stays 24 days.
Eight workers complete 3/5 of a job in 6 days. How many more days will 12 workers need for the rest?
A 2 days
B 2 2/3 days
C 3 days
D 4 days
Answer: B. 2 2/3 days. The remaining work is 2/5; 12 workers complete 3/20 of the whole job per day, so time is 8/3 days.
A completes 3/8 of a job in 6 days. How long would the entire job take?
A 14 days
B 18 days
C 16 days
D 20 days
Answer: C. 16 days. One eighth takes 2 days; eight eighths take 16 days.
A and B together finish in 8 days. A alone takes 12 days. How long does B alone need?
A 16 days
B 20 days
C 32 days
D 24 days
Answer: D. 24 days. B’s rate is 1/8−1/12 = 1/24 per day.
B is 50% more efficient than A. If A takes 20 days, how long does B take?
A 13 1/3 days
B 12 days
C 15 days
D 16 days
Answer: A. 13 1/3 days. B’s rate is 1.5 times A’s; time is 20÷1.5 = 13 1/3 days.
A works 2 days and B works 3 days. A alone needs 12 days and B 18 days. What fraction is completed?
A 1/4
B 1/3
C 1/2
D 2/3
Answer: B. 1/3. A completes 2/12 = 1/6 and B 3/18 = 1/6; total 1/3.
Forty workers could finish in 18 days. After 6 days, 10 more workers join. How many days does the job take in total?
A 14.4 days
B 16 days
C 15.6 days
D 18 days
Answer: C. 15.6 days. Total work is 720 worker-days; 240 are done; 480 remain for 50 workers = 9.6 days.
Twenty-four workers need 15 days. After 5 days, 6 workers leave. Find the total time.
A 17 days
B 19 days
C 20 days
D 18 1/3 days
Answer: D. 18 1/3 days. Total work is 360 worker-days; 120 are done; 240 remain for 18 workers = 13 1/3 days.
A takes 10 days and B takes 15 days. A works alone for 2 days, then leaves. How long does the job take?
A 14 days
B 12 days
C 15 days
D 16 days
Answer: A. 14 days. A completes 1/5; B completes the remaining 4/5 in 12 days.
A takes 18 days and B takes 24 days. How long do they take together?
A 9 days
B 10 2/7 days
C 11 days
D 12 days
Answer: B. 10 2/7 days. Combined rate is 1/18+1/24 = 7/72; time is 72/7 days.
A and B together take 16 days. A alone takes 24 days. Find B’s time alone.
A 32 days
B 40 days
C 48 days
D 56 days
Answer: C. 48 days. B’s rate is 1/16−1/24 = 1/48 per day.
A completes 2/3 of a job in 10 days. How long would the full job take?
A 12 days
B 18 days
C 20 days
D 15 days
Answer: D. 15 days. The full job is 3/2 times as much work: 10×3/2 = 15 days.
B works 30% slower than A. If A takes 12 days, how long does B take?
A 17 1/7 days
B 15 days
C 16 days
D 18 days
Answer: A. 17 1/7 days. B’s rate is 70% of A’s, so time is 12÷0.70 = 120/7 days.
Fifteen workers work 8 hours a day for 12 days. How many days do 10 workers working 6 hours a day need?
A 18 days
B 24 days
C 20 days
D 30 days
Answer: B. 24 days. The job is 1,440 worker-hours; new daily capacity is 60 worker-hours.
A completes 60% of a job in 9 days. B works twice as fast as A and completes the rest. How long does the job take?
A 10 days
B 13 days
C 12 days
D 15 days
Answer: C. 12 days. A’s rate is 1/15 per day; B takes 3 days for the remaining 40%; total 12 days.