Preventive maintenance is performed according to what?
A Planned interval or usage
B Failure occurrence only
C Customer demand
D Inspection sample
Answer: A. Planned interval or usage. Preventive work is scheduled to reduce failure likelihood.
Predictive maintenance is based mainly on what?
A Condition monitoring
B Fixed calendar only
C Product color
D Inventory count
Answer: A. Condition monitoring. Predictive maintenance uses measured condition to anticipate failures.
Corrective maintenance is performed after what?
A Every fixed hour
B Each product shipment
C Fault detection or failure
D Customer forecast
Answer: C. Fault detection or failure. Corrective actions restore equipment after a fault or breakdown.
Total productive maintenance seeks what equipment goal?
A Maximum inventory
B Zero operator input
C Single-machine layouts
D High overall effectiveness
Answer: D. High overall effectiveness. TPM engages operators and maintenance teams to improve equipment effectiveness.
MTBF is mean time between what?
A Repairs
B Failures
C Inspections
D Production shifts
Answer: B. Failures. MTBF measures average operating time between failures.
MTTR is mean time to what?
A Failure
B Repair
C Production
D Order
Answer: B. Repair. MTTR measures average time required to restore equipment after failure.
Steady-state availability using MTBF and MTTR is what?
A MTTR / MTBF
B MTBF / (MTBF + MTTR)
C MTBF × MTTR
D MTBF + MTTR
Answer: B. MTBF / (MTBF + MTTR). Availability equals MTBF divided by total mean operating and repair time.
The first step of 5S is which?
A Shine
B Standardize
C Sort
D Sustain
Answer: C. Sort. 5S begins by sorting necessary items from unnecessary ones.
Lean manufacturing seeks to remove what?
A Customer value
B Non-value-added waste
C Product quality
D Useful work
Answer: B. Non-value-added waste. Lean identifies and reduces activities that do not add customer value.
A value-added step changes the product in a way the customer values and what?
A Requires extra inspection
B Creates rework
C Is done right first time
D Adds inventory only
Answer: C. Is done right first time. Value-added work changes the product to meet customer needs correctly.
SMED primarily reduces what?
A Machine rated power
B Changeover time
C Product size
D Supplier lead time
Answer: B. Changeover time. Single-minute exchange of die methods shorten setup and changeover times.
Theory of Constraints focuses improvement on what?
A Every resource equally
B Finished inventory only
C System constraint
D Product appearance
Answer: C. System constraint. TOC identifies and manages the constraint limiting system throughput.
A bottleneck process sets the maximum system what?
A Throughput
B Product variety
C Quality target
D Supplier count
Answer: A. Throughput. The slowest constrained resource limits output rate.
A flexible manufacturing system combines automated machines with what?
A Manual casting only
B Fixed single product
C No scheduling
D Material handling control
Answer: D. Material handling control. FMS integrates CNC machines, material handling and computer control for varied production.
Computer-integrated manufacturing links design, planning and what?
A Production control
B Retail advertising
C Customer credit
D Fuel processing
Answer: A. Production control. CIM connects computer-based systems across manufacturing functions.
An automated guided vehicle moves material using what?
A Overhead crane only
B Manual pushing
C Fixed conveyor only
D Guidance system
Answer: D. Guidance system. AGVs follow wire, tape, laser or other guidance paths.
Work sampling estimates activity proportions using what?
A Continuous time study
B Only machine output
C Quality inspection
D Random observations
Answer: D. Random observations. Work sampling uses many random observations to estimate time spent in activities.
A time study establishes standard time by observing what?
A Product demand
B Machine purchase cost
C Supplier distance
D Task duration
Answer: D. Task duration. Time study measures task elements to establish normal and standard times.
Line balancing minimizes station idle time while respecting what?
A Cycle time
B Inventory value
C Material hardness
D Customer age
Answer: A. Cycle time. Tasks are assigned so station workload fits the required cycle time.
A workstation ergonomic review evaluates posture and what?
A Product color
B Supplier price
C Repetition and force
D Machine serial number
Answer: C. Repetition and force. Ergonomic risk includes posture, force, repetition and duration.
Injury prevention programs aim to reduce what?
A Product quality
B Workplace hazards
C Equipment uptime
D Customer demand
Answer: B. Workplace hazards. Safety programs identify and control workplace hazards to prevent injury.
Reverse logistics manages product flow from customer back to what?
A Raw-material mine only
B Machine supplier only
C Recovery or disposal
D Sales forecast
Answer: C. Recovery or disposal. Reverse logistics handles returns, repair, reuse, recycling and disposal.
Sustainable production seeks to reduce resource use and what?
A Product reliability
B Customer value
C Process capability
D Environmental impact
Answer: D. Environmental impact. Sustainable production improves resource efficiency and reduces environmental burdens.
A preventive maintenance plan should include task, interval and what?
A Responsible resource
B Product selling price
C Customer address
D Material color
Answer: A. Responsible resource. A useful maintenance plan defines work content, frequency, responsibility and required resources.
A visual control makes abnormal conditions what?
A Easy to recognize
B Harder to find
C Invisible
D Automatically harmless
Answer: A. Easy to recognize. Visual controls make normal and abnormal states apparent at a glance.