Demand forecasting estimates what future quantity?
A Machine failures
B Customer demand
C Operator count
D Inspection tools
Answer: B. Customer demand. Forecasts estimate future demand to support production and inventory decisions.
Economic order quantity balances ordering cost with what?
A Scrap rate
B Machine speed
C Defect severity
D Holding cost
Answer: D. Holding cost. EOQ minimizes the sum of ordering and inventory holding costs under its assumptions.
A reorder point triggers replenishment based on demand during what?
A Setup time
B Inspection time
C Machine life
D Lead time
Answer: D. Lead time. The reorder point covers expected demand during replenishment lead time plus safety stock.
Safety stock protects against demand or lead-time what?
A Uncertainty
B Quality standards
C Machine layout
D Product redesign
Answer: A. Uncertainty. Safety stock buffers variation in demand and replenishment time.
Lead time is elapsed time from order to what?
A Machine breakdown
B Inspection start
C Receipt or completion
D Demand forecast
Answer: C. Receipt or completion. Lead time spans order release through receipt or production completion.
ABC inventory analysis ranks items by annual usage what?
A Physical size
B Value
C Color
D Storage aisle
Answer: B. Value. ABC classification often uses annual consumption value to prioritize control.
Inventory turnover is cost of goods sold divided by what?
A Average inventory
B Maximum demand
C Safety stock
D Order quantity
Answer: A. Average inventory. Inventory turnover measures how often average inventory is sold or used.
Holding costs rise with larger average what?
A Inventory
B Customer demand
C Machine capacity
D Cycle time
Answer: A. Inventory. More inventory ties up capital, storage and risk costs.
Setup cost is incurred when a process changes what?
A Customer location
B Quality standard
C Shift length
D Production run
Answer: D. Production run. Setup costs arise from preparing equipment for a new product or batch.
MRP explodes requirements from which document?
A Control chart
B Pareto diagram
C Bill of materials
D Capacity factor
Answer: C. Bill of materials. MRP expands finished-product demand into dependent component requirements using the BOM.
Capacity planning checks resources against what?
A Product color
B Planned workload
C Supplier ownership
D Inspection method only
Answer: B. Planned workload. Capacity planning verifies machines, labor and shifts can meet the schedule.
A master production schedule specifies what?
A Tool wear limits
B Machine locations
C Supplier quality audits
D End-item quantities and dates
Answer: D. End-item quantities and dates. The MPS states which end items are to be produced and when.
Shop scheduling assigns jobs to what?
A Machines and time slots
B Customers and prices
C Warehouses only
D Product names
Answer: A. Machines and time slots. Scheduling allocates jobs to resources and determines their sequence and timing.
A Gantt chart displays activities against what?
A Product mass
B Quality level
C Time
D Inventory value
Answer: C. Time. Gantt charts show planned or actual activities across a time scale.
Dispatching releases work to which stage?
A Long-term forecasting
B Shop-floor execution
C Product design
D Supplier selection
Answer: B. Shop-floor execution. Dispatching authorizes and sends scheduled work to the production floor.
Shortest-processing-time sequencing tends to reduce average what?
A Flow time
B Machine capacity
C Demand uncertainty
D Setup cost always
Answer: A. Flow time. SPT sequencing often minimizes average flow time for a single machine.
Critical ratio scheduling compares time remaining with what?
A Inventory value
B Machine age
C Work remaining
D Inspection count
Answer: C. Work remaining. Critical ratio is time until due divided by remaining processing time.
Throughput is the rate of completed what?
A Good units
B Work-in-process only
C Supplier orders
D Machine hours
Answer: A. Good units. Throughput measures finished output per unit time.
Work in process is inventory between which stages?
A Supplier and warehouse only
B Customer and retailer
C Start and completion
D Design and sales only
Answer: C. Start and completion. WIP consists of units that have entered production but are not finished.
Little’s Law relates WIP to throughput and what?
A Defect rate
B Flow time
C Setup cost
D Machine utilization
Answer: B. Flow time. Little’s Law is WIP = throughput × flow time.
A pull system authorizes production from what?
A Forecast alone
B Downstream demand
C Maximum capacity
D Supplier inventory
Answer: B. Downstream demand. Pull production responds to actual downstream consumption.
ERP integrates production planning with what business functions?
A Only machine controls
B Only inspection gauges
C Only product styling
D Finance and supply chain
Answer: D. Finance and supply chain. ERP links manufacturing with finance, purchasing, inventory and other enterprise functions.
Supply-chain management coordinates suppliers, production and what?
A Machine lubrication
B Control limits
C Customer delivery
D Tool geometry
Answer: C. Customer delivery. Supply-chain management coordinates material and information from source to customer.
Overall equipment effectiveness multiplies availability, performance and what?
A Quality rate
B Inventory turnover
C Demand forecast
D Setup time
Answer: A. Quality rate. OEE = availability × performance × quality.
A production backlog is work that is what?
A Already shipped
B Never ordered
C Scrapped always
D Released but unfinished
Answer: D. Released but unfinished. Backlog is accepted work not yet completed or delivered.