Economic dispatch seeks unit outputs that meet demand while minimizing what?
A Grid frequency
B Operating cost
C Pole count
D Transformer mass
Answer: B. Operating cost. It allocates generation among available units subject to operating constraints.
Ignoring network losses and limits, optimal dispatch of unconstrained thermal units tends to equalize what?
A Nameplate capacities
B Fuel inventories
C Cooling-water flows
D Incremental costs
Answer: D. Incremental costs. If marginal costs differ, shifting output can reduce total cost.
Incremental generation cost describes the cost of producing what?
A All installed capacity
B Only reactive power
C Generator iron core
D Next unit of energy
Answer: D. Next unit of energy. It is the change in operating cost for an additional MWh.
Unit commitment decides which generators should be what over time?
A Star or delta
B Two or four poles
C On or off
D AC or DC only
Answer: C. On or off. It schedules unit starts and shutdowns while meeting demand and reserves.
A ramp-rate limit constrains how quickly a unit can change what?
A Pole count
B Fuel chemistry
C Power output
D Transmission voltage only
Answer: C. Power output. Thermal and mechanical limits bound output change per minute.
A minimum stable output limits how far an online unit can do what?
A Raise voltage
B Change frequency
C Store water
D Reduce generation
Answer: D. Reduce generation. An operating unit may not be able to run below its stable load.
Start-up time matters in scheduling because an offline unit cannot do what instantly?
A Have nameplate capacity
B Deliver rated output
C Consume fuel
D Connect a transformer
Answer: B. Deliver rated output. A plant needs time to start and synchronize before supplying power.
Which reserve is synchronized and can increase output promptly?
A Planned outage
B Fuel stockpile
C Spinning reserve
D Installed but unavailable unit
Answer: C. Spinning reserve. Online headroom can respond quickly to a shortfall.
Contingency reserve is held chiefly to cover what?
A Routine meter reading
B Fuel price publication
C Unexpected unit or line loss
D Normal pole changing
Answer: C. Unexpected unit or line loss. It helps replace supply after a sudden outage.
Primary frequency response initially acts through what on conventional generators?
A Tap changer only
B Smoke scrubber
C Cooling tower
D Governors
Answer: D. Governors. Governors adjust prime-mover power in response to frequency change.
Automatic generation control helps restore what after primary response?
A Frequency and interchange
B Pole count
C Coal particle size
D Transformer turns
Answer: A. Frequency and interchange. Secondary control moves generator setpoints to correct frequency and tie-line error.
Automatic voltage regulators chiefly adjust what generator quantity?
A Excitation
B Fuel rate
C Rotor pole count
D Boiler pressure
Answer: A. Excitation. Field control changes reactive output and voltage.
Generator rotational inertia helps slow the initial rate of change of what?
A Fuel price
B Grid frequency
C Daily energy
D Line resistance
Answer: B. Grid frequency. Stored kinetic energy buffers an immediate power imbalance.
A black-start unit can begin operating without what?
A Any fuel
B External grid supply
C Any generator
D A prime mover
Answer: B. External grid supply. It has local means to start and energize part of a dead grid.
An electrical island is a separated system that must balance what internally?
A Generation and demand
B Only oil temperature
C Only power factor
D Only fuel price
Answer: A. Generation and demand. Without a larger grid connection, the island must regulate its own frequency and voltage.
Curtailment of a wind or solar plant means what happens?
A Available output is reduced
B The turbine is enlarged
C Grid frequency doubles
D All energy is stored
Answer: A. Available output is reduced. Operational limits can require output below available resource capability.
Generation forecasting helps operators plan around what?
A Only rotor pole count
B Future output and demand
C Only core saturation
D Fixed power factor
Answer: B. Future output and demand. Forecasts inform scheduling and reserve needs.
A peaking unit is especially valuable for what operational property?
A Continuous identical output
B Zero start-up cost always
C No fuel requirement
D Flexible response
Answer: D. Flexible response. It can help meet short periods of high demand.
Combined heat and power can improve total fuel utilization by delivering electricity and what?
A Useful heat
B Extra pole count
C Higher frequency
D Only ash
Answer: A. Useful heat. Recovered thermal energy serves industrial or building loads.
Emissions intensity expresses pollutant quantity per unit of what?
A Generator speed
B Installed poles
C Voltage angle
D Electric energy
Answer: D. Electric energy. It may be stated as grams of CO2 per kWh.
At 500 g CO2/kWh, generating 1000 kWh emits how much CO2?
A 50 kg
B 5 kg
C 500 kg
D 5000 kg
Answer: C. 500 kg. 500Γ1000 g=500,000 g=500 kg.
A lower heat rate for similar fuel and conditions generally means what?
A Higher thermal efficiency
B Lower output always
C Higher pole count
D Zero fuel input
Answer: A. Higher thermal efficiency. Less heat input is needed for each unit of electricity.
A planned outage is scheduled mainly for what purpose?
A Immediate fault isolation
B Changing grid phase sequence
C Maintenance
D Daily peak shaving
Answer: C. Maintenance. Equipment is taken out of service deliberately for inspection or repair.
A forced outage is an unplanned loss of what?
A Unit availability
B Rated frequency
C Energy unit
D Nameplate voltage
Answer: A. Unit availability. Unexpected failures remove a generator from service.
If a 100 MW plant supplies 80 MW at one instant, what fraction of capacity is used then?
A 20%
B 80%
C 100%
D 125%
Answer: B. 80%. 80/100=0.8, or 80% of rated power at that instant.