Power Generation MCQs (Set-4)

Economic dispatch seeks unit outputs that meet demand while minimizing what?

A Grid frequency
B Operating cost
C Pole count
D Transformer mass

Ignoring network losses and limits, optimal dispatch of unconstrained thermal units tends to equalize what?

A Nameplate capacities
B Fuel inventories
C Cooling-water flows
D Incremental costs

Incremental generation cost describes the cost of producing what?

A All installed capacity
B Only reactive power
C Generator iron core
D Next unit of energy

Unit commitment decides which generators should be what over time?

A Star or delta
B Two or four poles
C On or off
D AC or DC only

A ramp-rate limit constrains how quickly a unit can change what?

A Pole count
B Fuel chemistry
C Power output
D Transmission voltage only

A minimum stable output limits how far an online unit can do what?

A Raise voltage
B Change frequency
C Store water
D Reduce generation

Start-up time matters in scheduling because an offline unit cannot do what instantly?

A Have nameplate capacity
B Deliver rated output
C Consume fuel
D Connect a transformer

Which reserve is synchronized and can increase output promptly?

A Planned outage
B Fuel stockpile
C Spinning reserve
D Installed but unavailable unit

Contingency reserve is held chiefly to cover what?

A Routine meter reading
B Fuel price publication
C Unexpected unit or line loss
D Normal pole changing

Primary frequency response initially acts through what on conventional generators?

A Tap changer only
B Smoke scrubber
C Cooling tower
D Governors

Automatic generation control helps restore what after primary response?

A Frequency and interchange
B Pole count
C Coal particle size
D Transformer turns

Automatic voltage regulators chiefly adjust what generator quantity?

A Excitation
B Fuel rate
C Rotor pole count
D Boiler pressure

Generator rotational inertia helps slow the initial rate of change of what?

A Fuel price
B Grid frequency
C Daily energy
D Line resistance

A black-start unit can begin operating without what?

A Any fuel
B External grid supply
C Any generator
D A prime mover

An electrical island is a separated system that must balance what internally?

A Generation and demand
B Only oil temperature
C Only power factor
D Only fuel price

Curtailment of a wind or solar plant means what happens?

A Available output is reduced
B The turbine is enlarged
C Grid frequency doubles
D All energy is stored

Generation forecasting helps operators plan around what?

A Only rotor pole count
B Future output and demand
C Only core saturation
D Fixed power factor

A peaking unit is especially valuable for what operational property?

A Continuous identical output
B Zero start-up cost always
C No fuel requirement
D Flexible response

Combined heat and power can improve total fuel utilization by delivering electricity and what?

A Useful heat
B Extra pole count
C Higher frequency
D Only ash

Emissions intensity expresses pollutant quantity per unit of what?

A Generator speed
B Installed poles
C Voltage angle
D Electric energy

At 500 g CO2/kWh, generating 1000 kWh emits how much CO2?

A 50 kg
B 5 kg
C 500 kg
D 5000 kg

A lower heat rate for similar fuel and conditions generally means what?

A Higher thermal efficiency
B Lower output always
C Higher pole count
D Zero fuel input

A planned outage is scheduled mainly for what purpose?

A Immediate fault isolation
B Changing grid phase sequence
C Maintenance
D Daily peak shaving

A forced outage is an unplanned loss of what?

A Unit availability
B Rated frequency
C Energy unit
D Nameplate voltage

If a 100 MW plant supplies 80 MW at one instant, what fraction of capacity is used then?

A 20%
B 80%
C 100%
D 125%