Basic Surveying MCQs (Set-1)

What is the basic purpose of surveying?

A Determine relative point positions
B Test concrete strength
C Measure traffic speed
D Design electrical circuits

What is a fundamental principle of surveying?

A Work from detail to whole
B Work from whole to part
C Avoid control points
D Use only one measurement

What does chain surveying primarily measure directly?

A Horizontal distances
B Water pressure
C Concrete temperature
D Magnetic declination

What is the main purpose of levelling?

A Measure concrete strength
B Determine elevation differences
C Set magnetic declination
D Find soil chemistry

What is a benchmark in surveying?

A Temporary sighting mark
B Unknown traverse station
C Tape correction
D Point with known elevation

What line does a properly adjusted level establish?

A Vertical magnetic axis
B Sloping staff line
C Horizontal line of sight
D Contour boundary

What is a backsight in differential levelling?

A Last reading before moving
B First reading after setup
C Intermediate contour reading
D A tape correction

What does a contour line connect?

A Points of equal distance
B Points of equal bearing
C Points of equal rainfall
D Points of equal elevation

What is contour interval?

A Horizontal map scale
B Distance between survey stations
C Vertical difference between contours
D Bearing difference

What does a map scale express?

A Map distance to ground distance
B Ground slope to elevation
C Bearing to azimuth
D Error to precision

What can a total station measure?

A Angles and slope distances
B Only temperature
C Only soil density
D Only water flow

What does EDM stand for in surveying?

A Elevation datum marker
B Error distribution method
C Earth direction model
D Electronic distance measurement

What does a theodolite measure?

A Only elevations
B Only horizontal distance
C Horizontal and vertical angles
D Soil moisture

What does a magnetic compass indicate?

A True elevation
B Horizontal distance
C Magnetic direction
D Grid scale

What is a traverse survey?

A Single isolated contour
B Only leveling run
C One vertical angle
D Connected measured survey lines

What does plane-table surveying allow?

A Plot details in the field
B Measure water quality
C Test concrete curing
D Compute wind pressure

What does GNSS use to determine position?

A Only magnetic compass readings
B Only tape corrections
C Only contour intervals
D Signals from navigation satellites

What is accuracy in measurement?

A Closeness to true value
B Repeatability only
C Number of decimals
D Instrument weight

What is precision in repeated measurements?

A Closeness among measurements
B Closeness to true value only
C Survey area
D Map sheet number

What is a gross surveying error often called?

A Random error
B Blunder
C Datum shift
D Curvature correction

What is a systematic measurement error?

A Unpredictable scatter only
B Consistent bias
C A contour interval
D A backsight

What characterizes random measurement error?

A Fixed bias only
B Unpredictable small variation
C Known scale factor
D A benchmark elevation

What does a map projection do?

A Measures staff readings
B Corrects tape tension
C Maps curved Earth to plane
D Sets contour interval

What is the geoid related to?

A A map scale
B Tape length
C Local magnetic north
D Mean sea-level gravity surface

What is setting out in construction surveying?

A Measure material strength
B Calculate daily rainfall
C Mark design positions on site
D Adjust a total station