Introduction to Civil Engineering MCQs (Set-4)

A 1:500 site plan shows 86 mm between points. Find ground distance.

A 43 m
B 4.3 m
C 17.2 m
D 430 m

A design resistance is 480 kN and applied demand is 320 kN. Find factor of safety.

A 1.5
B 0.67
C 1.0
D 2.0

A 12 m by 9 m slab is 180 mm thick. Find concrete volume.

A 9.72 mΒ³
B 19.44 mΒ³
C 18 mΒ³
D 194.4 mΒ³

Using Q=0.00278 C i A, find Q for C 0.7, i 80 mm/h, A 5 ha.

A 0.078 mΒ³/s
B 0.779 mΒ³/s
C 0.389 mΒ³/s
D 1.56 mΒ³/s

A simply supported 8 m beam carries a uniform 20 kN/m load. Find peak moment.

A 80 kNΒ·m
B 120 kNΒ·m
C 320 kNΒ·m
D 160 kNΒ·m

With specified factors 1.2D and 1.6L, D is 200 kN and L is 100 kN. Find factored load.

A 280 kN
B 400 kN
C 320 kN
D 440 kN

Two foundations 20 m apart settle 10 mm and 30 mm. Find angular distortion magnitude.

A 1 in 100
B 1 in 500
C 1 in 2000
D 1 in 1000

A 20,000 kg train climbs a 1% grade. Approximate grade resistance.

A 0.20 kN
B 1.96 kN
C 0.98 kN
D 19.6 kN

A structure's factored resistance is 900 kN and demand is 750 kN. Find reserve above demand.

A 150 kN
B 75 kN
C 300 kN
D 1650 kN

Which task should be prioritized if it delays every downstream activity?

A Critical-path activity
B Noncritical float activity
C Unscheduled inspection
D Optional landscaping

A stormwater model predicts capacity is exceeded during a design event. What is the direct response?

A Reduce survey accuracy
B Ignore the rainfall input
C Revise conveyance or storage
D Remove maintenance access

What does differential settlement threaten first in a stiff frame?

A Concrete color
B Serviceability and cracking
C Grid frequency
D Traffic signal phase

A retaining wall shows water pressure buildup. Which design feature addresses drainage?

A More paint layers
B A wider traffic lane
C A softer survey datum
D Drainage layer and outlets

A construction drawing conflicts with a coordinated BIM model. What is the controlled first step?

A Resolve and document the conflict
B Build both options
C Delete inspection records
D Change scope informally

A concrete placement is interrupted beyond the planned sequence. What is the key concern?

A Survey scale only
B Traffic sign spacing
C Steel color
D Cold-joint location and preparation

A slope's estimated resisting force is 600 kN and driving force is 400 kN. Find factor of safety.

A 0.67
B 1.0
C 1.5
D 2.5

An alternative costs more initially but has lower maintenance and replacement cost. Which method compares total cost fairly?

A Initial bid comparison only
B Life-cycle cost analysis
C Material color review
D Single-year budget check

What should an EIA mitigation hierarchy do first?

A Compensate before avoiding
B Ignore alternatives
C Avoid impacts where feasible
D Delay monitoring

A building site is in a flood-prone area. What supports climate resilience?

A Reduce drainage capacity
B Ignore future conditions
C Assess hazard and adapt design
D Remove access routes

A nonconforming concrete test result is received. What is the quality response?

A Discard the test record
B Pour over the result
C Change acceptance limits
D Record, assess and correct

A worker enters an unprotected excavation. What is the immediate priority?

A Continue the schedule
B Remove the barricade
C Stop work and control hazard
D Wait for final inspection

Two drainage pipes clash with a foundation in the model. What is the main value of early coordination?

A Increase excavation risk
B Hide the design change
C Avoid field rework
D Reduce survey control

A material has low initial cost but poor durability in a marine environment. What should guide selection?

A Lowest purchase price only
B Color preference only
C Delivery date only
D Exposure and service-life performance

Why should a project change be formally controlled?

A Assess scope, cost and risk
B Remove design accountability
C Avoid stakeholder review
D Skip drawing updates

A bridge maintenance program is being prioritized. What is a sound basis?

A Condition, risk and consequence
B Age alone
C Appearance alone
D Lowest inspection cost