On a 1:500 plan, a distance is 2 cm. Find ground distance.
A 1 m
B 10 m
C 5 m
D 100 m
Answer: B. 10 m. A 1:500 scale means 1 cm represents 500 cm, or 5 m; 2 cm represents 10 m.
On a 1:2000 map, two points are 4 cm apart. Find ground distance.
A 8 m
B 40 m
C 800 m
D 80 m
Answer: D. 80 m. Four centimetres times 2000 equals 8000 cm, or 80 m.
Using Q=0.00278 C i A, find runoff for C 0.5, i 50 mm/h, A 2 ha.
A 0.139 mΒ³/s
B 0.028 mΒ³/s
C 0.278 mΒ³/s
D 1.39 mΒ³/s
Answer: A. 0.139 mΒ³/s. The rational-method estimate is 0.00278 times 0.5 times 50 times 2, which is about 0.139 cubic metres per second.
A 20 mm rainfall falls on a 2 kmΒ² catchment. Find gross rainfall volume.
A 40,000 mΒ³
B 4,000 mΒ³
C 20,000 mΒ³
D 400,000 mΒ³
Answer: A. 40,000 mΒ³. Rainfall volume is depth times area: 0.02 m times 2,000,000 mΒ² equals 40,000 mΒ³ before losses.
A simply supported 6 m beam carries a 20 kN midspan point load. Find peak moment.
A 15 kNΒ·m
B 30 kNΒ·m
C 60 kNΒ·m
D 120 kNΒ·m
Answer: B. 30 kNΒ·m. For a central point load on a simply supported beam, maximum moment is PL/4: 20 times 6 divided by 4 is 30 kNΒ·m.
A foundation supports 1500 kN over 10 mΒ². Find average bearing pressure.
A 15 kPa
B 150 kPa
C 100 kPa
D 1500 kPa
Answer: B. 150 kPa. Average pressure is load divided by area: 1500 kN divided by 10 mΒ² is 150 kN/mΒ², or 150 kPa.
A slab is 10 m by 8 m and 0.15 m thick. Find concrete volume.
A 1.2 mΒ³
B 8 mΒ³
C 18 mΒ³
D 12 mΒ³
Answer: D. 12 mΒ³. Volume equals length times width times thickness: 10 times 8 times 0.15 is 12 cubic metres.
A mix uses 200 kg water and 400 kg cement. Find water-cement ratio.
A 0.50
B 0.25
C 0.75
D 2.0
Answer: A. 0.50. Water-cement ratio by mass is water divided by cement: 200 divided by 400 equals 0.50.
What does a load path help verify?
A Forces reach the foundation
B Paint color matches drawings
C Water treatment is complete
D Traffic volume is low
Answer: A. Forces reach the foundation. A load path review checks that forces can travel continuously through structural members and supports to the ground.
A resistance estimate is 300 kN and demand is 150 kN. Find factor of safety.
A 0.5
B 2.0
C 1.5
D 3.0
Answer: B. 2.0. Factor of safety is resistance divided by demand: 300 divided by 150 equals 2.
What identifies activities that control project finish date?
A Contour interval
B Load path
C Water table
D Critical path
Answer: D. Critical path. The critical path is the longest dependent sequence of activities that determines the earliest project completion date.
What does BIM clash detection find?
A Soil bearing capacity
B Model conflicts between systems
C Traffic signal timing
D Concrete water content
Answer: B. Model conflicts between systems. Clash detection checks coordinated models for spatial conflicts such as ducts intersecting beams.
What do closely spaced contour lines indicate?
A Steep ground
B Flat ground
C High groundwater only
D Low traffic volume
Answer: A. Steep ground. Closely spaced contours represent a larger elevation change over a shorter horizontal distance, indicating a steeper slope.
What can GIS overlay analysis combine?
A Several spatial data layers
B Only structural equations
C Only concrete batches
D Only project invoices
Answer: A. Several spatial data layers. GIS overlay combines spatial layers such as land use, drainage, soils and infrastructure for analysis.
What does biological wastewater treatment mainly use?
A Microorganisms to remove pollutants
B Steel reinforcement
C Photovoltaic cells
D Traffic signals
Answer: A. Microorganisms to remove pollutants. Biological treatment uses microorganisms to consume or transform biodegradable contaminants in wastewater.
What does pavement thickness design respond to?
A Building daylight only
B Paint durability
C Survey instrument type
D Traffic and subgrade support
Answer: D. Traffic and subgrade support. Pavement design considers traffic loading, subgrade support, materials, environment and target service life.
What does a footing do under a column?
A Raises grid frequency
B Measures rainfall
C Spreads load to soil
D Controls traffic
Answer: C. Spreads load to soil. A footing distributes a concentrated structural load over a larger soil area.
What does an inspection test plan define?
A Only project profit
B Only room layout
C Checks, criteria and records
D Only land ownership
Answer: C. Checks, criteria and records. An inspection and test plan identifies required checks, acceptance criteria, responsibility and documentation.
What is a mitigation measure in an EIA?
A A higher design load
B A survey coordinate
C Action reducing project impact
D A payment certificate
Answer: C. Action reducing project impact. Mitigation avoids, minimizes, restores or compensates for identified environmental impacts.
What does life-cycle costing compare?
A Only first purchase price
B Only material color
C Costs across service life
D Only contractor headcount
Answer: C. Costs across service life. Life-cycle costing includes relevant costs such as construction, operation, maintenance and replacement over time.
What does a hazard assessment identify?
A Only completed quantities
B Only traffic speed
C Only building age
D Risks before work starts
Answer: D. Risks before work starts. Hazard assessment identifies potential harm and supports planning of controls before work proceeds.
What is differential settlement?
A Uniform thermal expansion
B Traffic volume variation
C Unequal foundation movement
D Concrete color change
Answer: C. Unequal foundation movement. Differential settlement is nonuniform vertical movement that can distort structural elements and cause cracking.
What is a key role of reinforcement detailing?
A Set groundwater level
B Ensure force transfer and anchorage
C Measure pavement friction
D Determine plot boundaries
Answer: B. Ensure force transfer and anchorage. Detailing provides adequate anchorage, development and force transfer between reinforcement and concrete.
What does a sustainability assessment compare?
A Only construction duration
B Only structural depth
C Only equipment color
D Impacts and performance tradeoffs
Answer: D. Impacts and performance tradeoffs. Sustainability assessment considers environmental, social and economic performance across alternatives and the project life cycle.
What does a site benchmark provide?
A Concrete strength result
B Traffic control plan
C Known elevation reference
D Material delivery schedule
Answer: C. Known elevation reference. A benchmark is a fixed point with known elevation used as a reference for levelling.