What does a feasibility study assess before design?
A Only final paint color
B Whether a project is viable
C Only rebar diameter
D Only contractor uniforms
Answer: B. Whether a project is viable. A feasibility study evaluates whether a project is technically, economically, environmentally and socially practical.
Who usually establishes project requirements and objectives?
A Material supplier only
B Survey instrument
C Nearby traffic
D Project owner or client
Answer: D. Project owner or client. The owner or client defines the need, objectives, constraints and requirements for a project.
What does a design consultant typically provide?
A Only construction labor
B Only land ownership
C Engineering design and advice
D Only utility billing
Answer: C. Engineering design and advice. Consultants provide professional planning, analysis, design and technical advice to the client.
Who normally executes construction work under contract?
A Building occupant
B Design standard
C Survey benchmark
D Contractor
Answer: D. Contractor. The contractor organizes labor, equipment and methods to construct the project in accordance with contract documents.
What is a project specification?
A A site contour map
B A soil particle
C A traffic signal
D Written technical requirements
Answer: D. Written technical requirements. Specifications describe required materials, workmanship, quality and performance for project work.
What does a bill of quantities help describe?
A Measured work items and quantities
B Only design elevations
C Only soil chemistry
D Only traffic speed
Answer: A. Measured work items and quantities. A bill of quantities lists measured work items and quantities used for tendering, costing or payment.
What is a survey datum?
A Concrete curing method
B Reference for elevations or coordinates
C Steel grade
D Traffic lane width
Answer: B. Reference for elevations or coordinates. A datum provides a defined reference surface or coordinate basis for survey measurements.
What do contour lines connect on a topographic map?
A Points of equal elevation
B Equal traffic volume
C Equal concrete strength
D Equal property value
Answer: A. Points of equal elevation. Each contour line joins points having the same elevation relative to the stated datum.
What is the purpose of a geotechnical site investigation?
A Set building occupancy
B Measure daylight only
C Characterize subsurface conditions
D Select traffic signs
Answer: C. Characterize subsurface conditions. Site investigation identifies soil, rock and groundwater conditions that affect foundations and earthworks.
What information does a borehole provide?
A Building energy tariff
B Subsurface soil and rock profile
C Traffic signal phase
D Concrete surface color
Answer: B. Subsurface soil and rock profile. Boreholes allow sampling and in-situ testing to characterize soil and rock below ground.
What can a laboratory soil test determine?
A Bridge traffic only
B Index and engineering properties
C Daylight factor only
D Contractor experience
Answer: B. Index and engineering properties. Laboratory tests measure properties such as gradation, plasticity, density, strength and compressibility.
Why is concrete cured after placing?
A Increase aggregate size
B Remove all cement
C Support hydration and strength development
D Change steel grade
Answer: C. Support hydration and strength development. Curing maintains suitable moisture and temperature so cement hydration and strength development can proceed.
What does water-cement ratio strongly affect in concrete?
A Steel yield stress
B Strength and durability
C Survey scale
D Traffic capacity
Answer: B. Strength and durability. Water-cement ratio influences concrete workability, porosity, strength and durability when other factors are controlled.
Why is steel reinforcement placed in concrete?
A Reduce all dead load
B Replace curing water
C Carry tensile forces
D Measure settlement
Answer: C. Carry tensile forces. Reinforcement carries tensile forces and helps control cracking in reinforced-concrete members.
What does a bridge provide?
A A crossing over an obstacle
B A groundwater sample
C A soil classification
D A traffic tariff
Answer: A. A crossing over an obstacle. A bridge carries people, vehicles or services over an obstacle such as a river, road or valley.
What does pavement design primarily support?
A Building daylight
B Water treatment chemistry
C Repeated traffic loading
D Foundation settlement only
Answer: C. Repeated traffic loading. Pavement design selects layers and materials to carry expected traffic while controlling distress and serviceability.
What does storm drainage manage?
A Concrete hydration
B Runoff from rainfall
C Steel corrosion only
D Indoor lighting
Answer: B. Runoff from rainfall. Storm drainage collects and conveys runoff to reduce ponding, erosion and flood risk.
What is the purpose of wastewater treatment?
A Increase suspended solids
B Raise traffic speed
C Remove contaminants before discharge
D Measure soil bearing
Answer: C. Remove contaminants before discharge. Treatment reduces physical, chemical and biological contaminants to meet discharge or reuse requirements.
What does life-cycle assessment consider?
A Only excavation cost
B Only design hours
C Only final inspection
D Impacts across a product life
Answer: D. Impacts across a product life. Life-cycle assessment evaluates impacts from material extraction through construction, use, maintenance and end of life.
What does constructability review examine?
A Only architectural style
B Only office attendance
C Only land tax
D Practicality of construction methods
Answer: D. Practicality of construction methods. Constructability review checks whether design and sequencing can be safely and efficiently built with available methods and resources.
What should a site safety plan identify?
A Hazards and control measures
B Only concrete suppliers
C Only project profits
D Only room colors
Answer: A. Hazards and control measures. A safety plan identifies site hazards, responsibilities, procedures and controls for reducing risk.
What does climate resilience aim to improve?
A Ability to withstand and recover
B Initial paint finish
C Survey pole length
D Contractor profit
Answer: A. Ability to withstand and recover. Resilience reduces vulnerability and supports continued function and recovery under climate-related stresses.
What does infrastructure asset management coordinate?
A Performance, risk and life-cycle cost
B Only construction drawings
C Only traffic signs
D Only material color
Answer: A. Performance, risk and life-cycle cost. Asset management combines performance, risk, cost and maintenance decisions across an asset's life.
Why record construction quality inspections?
A Provide traceable compliance evidence
B Increase concrete water
C Replace design calculations
D Remove project history
Answer: A. Provide traceable compliance evidence. Inspection records document whether work meets requirements and support traceability and corrective action.
What does a structural load path show?
A How paint is selected
B How water is chlorinated
C How traffic is priced
D How loads reach foundations
Answer: D. How loads reach foundations. A load path traces forces from structural elements through supports and foundations into the ground.