Introduction to Civil Engineering MCQs (Set-2)

What does a feasibility study assess before design?

A Only final paint color
B Whether a project is viable
C Only rebar diameter
D Only contractor uniforms

Who usually establishes project requirements and objectives?

A Material supplier only
B Survey instrument
C Nearby traffic
D Project owner or client

What does a design consultant typically provide?

A Only construction labor
B Only land ownership
C Engineering design and advice
D Only utility billing

Who normally executes construction work under contract?

A Building occupant
B Design standard
C Survey benchmark
D Contractor

What is a project specification?

A A site contour map
B A soil particle
C A traffic signal
D Written technical requirements

What does a bill of quantities help describe?

A Measured work items and quantities
B Only design elevations
C Only soil chemistry
D Only traffic speed

What is a survey datum?

A Concrete curing method
B Reference for elevations or coordinates
C Steel grade
D Traffic lane width

What do contour lines connect on a topographic map?

A Points of equal elevation
B Equal traffic volume
C Equal concrete strength
D Equal property value

What is the purpose of a geotechnical site investigation?

A Set building occupancy
B Measure daylight only
C Characterize subsurface conditions
D Select traffic signs

What information does a borehole provide?

A Building energy tariff
B Subsurface soil and rock profile
C Traffic signal phase
D Concrete surface color

What can a laboratory soil test determine?

A Bridge traffic only
B Index and engineering properties
C Daylight factor only
D Contractor experience

Why is concrete cured after placing?

A Increase aggregate size
B Remove all cement
C Support hydration and strength development
D Change steel grade

What does water-cement ratio strongly affect in concrete?

A Steel yield stress
B Strength and durability
C Survey scale
D Traffic capacity

Why is steel reinforcement placed in concrete?

A Reduce all dead load
B Replace curing water
C Carry tensile forces
D Measure settlement

What does a bridge provide?

A A crossing over an obstacle
B A groundwater sample
C A soil classification
D A traffic tariff

What does pavement design primarily support?

A Building daylight
B Water treatment chemistry
C Repeated traffic loading
D Foundation settlement only

What does storm drainage manage?

A Concrete hydration
B Runoff from rainfall
C Steel corrosion only
D Indoor lighting

What is the purpose of wastewater treatment?

A Increase suspended solids
B Raise traffic speed
C Remove contaminants before discharge
D Measure soil bearing

What does life-cycle assessment consider?

A Only excavation cost
B Only design hours
C Only final inspection
D Impacts across a product life

What does constructability review examine?

A Only architectural style
B Only office attendance
C Only land tax
D Practicality of construction methods

What should a site safety plan identify?

A Hazards and control measures
B Only concrete suppliers
C Only project profits
D Only room colors

What does climate resilience aim to improve?

A Ability to withstand and recover
B Initial paint finish
C Survey pole length
D Contractor profit

What does infrastructure asset management coordinate?

A Performance, risk and life-cycle cost
B Only construction drawings
C Only traffic signs
D Only material color

Why record construction quality inspections?

A Provide traceable compliance evidence
B Increase concrete water
C Replace design calculations
D Remove project history

What does a structural load path show?

A How paint is selected
B How water is chlorinated
C How traffic is priced
D How loads reach foundations