Industrial Engineering MCQs (Set-3)

Plant location analysis considers markets, labor and what?

A Tool rake angle
B Gauge resolution
C Raw materials
D Gear module

A cellular layout groups machines around what?

A Departments only
B Part families
C Customer accounts
D Random jobs

Systematic layout planning uses closeness ratings to arrange what?

A Product prices
B Inspection limits
C Departments
D Machine speeds

A warehouse layout should support safe storage and what?

A Efficient picking
B Longer travel
C Higher handling damage
D Uncontrolled inventory

Economic order quantity balances ordering and what costs?

A Quality losses only
B Holding costs
C Machine repair
D Inspection labor

ABC inventory analysis commonly uses annual consumption what?

A Value
B Volume only
C Color
D Supplier count

Safety stock protects against uncertainty in demand and what?

A Machine color
B Lead time
C Product design
D Tool wear only

A queueing model studies arrivals, waiting and what?

A Surface finish
B Product geometry
C Service capacity
D Maintenance interval

Arrival rate is the number of arrivals per what?

A Unit length
B Unit mass
C Production batch
D Unit time

Service rate is the number served per what?

A Shift only
B Inventory unit
C Machine purchase
D Unit time

For a stable single-server queue, arrival rate must be below what?

A Zero service time
B Inventory level
C Service rate
D Machine cost

Little’s Law relates average number in system to flow rate and what?

A Average time
B Unit cost
C Machine count
D Defect rate

A simulation model imitates system behavior over what?

A Only one static drawing
B A single measurement
C Time
D One product dimension

The critical path is the longest-duration path through what?

A Project network
B Warehouse aisles
C Quality chart
D Process capability curve

PERT uses uncertain activity times with what estimates?

A One deterministic estimate
B No duration estimates
C Only a cost estimate
D Three time estimates

Project float is allowable delay without changing what?

A Completion milestone
B Activity cost
C Resource count
D Quality rating

A Gantt chart displays tasks against what?

A Product dimensions
B Resource quality
C Inventory value
D Calendar time

A precedence diagram represents what between tasks?

A Material density
B Dependency relationships
C Quality costs
D Machine torque

A bottleneck resource constrains system what?

A Product color
B Supplier distance
C Inventory accuracy
D Throughput

Theory of Constraints focuses improvement on what?

A Every task equally
B Finished goods only
C Customer price
D System constraint

A plant capacity cushion is extra capacity above what?

A Machine downtime
B Expected demand
C Supplier stock
D Actual quality

A facility material-flow analysis follows what through plant?

A Movement paths
B Only employee training
C Supplier pricing
D Equipment age

Cross-docking transfers inbound goods directly toward what?

A Outbound shipment
B Long-term storage
C Machine repair
D Quality lab only

Warehouse slotting places high-turnover items where?

A Farthest from dispatch
B Only upper shelves
C Easy to access
D Outside the facility

A process map helps identify steps, delays and what?

A Material hardness
B Rework
C Temperature limits
D Supplier ownership