Industrial Engineering MCQs (Set-1)

Industrial engineering designs and improves what?

A Only cutting tools
B Integrated systems
C Only power plants
D Only building structures

Productivity is output divided by what?

A Input
B Inventory
C Demand
D Machine age

Work study combines method study and what?

A Quality inspection
B Inventory valuation
C Work measurement
D Plant maintenance

Method study seeks the best way to do what?

A Measure temperature
B Select a supplier
C A task
D Calibrate a gauge

Time study establishes task time using what?

A Observed work cycles
B Demand forecasts
C Control limits
D Machine drawings

Standard time includes normal time plus what?

A Machine capacity
B Allowances
C Scrap count
D Material density

Predetermined motion-time systems estimate time from what?

A Machine purchase cost
B Basic human motions
C Product demand
D Supplier lead time

Work sampling uses observations taken at what times?

A Fixed cycle only
B Shift start only
C Random times
D After every unit

A flow process chart records work sequence and what?

A Only employee wages
B Product color
C Market demand
D Process delays and storage

A two-handed process chart tracks motions of which limbs?

A Left and right hands
B Both feet only
C Two operators only
D Two machines only

Motion economy seeks to reduce what?

A Product quality
B Work content value
C Operator skill
D Unnecessary motions

Ergonomics fits work to what?

A Machine speed only
B Factory floor color
C Human capabilities
D Supplier location

Workplace fatigue can result from high force and what?

A Low inventory
B Repetition
C Short lead time
D Good posture

Cycle time is time between successive what?

A Supplier orders
B Machine failures
C Inspection audits
D Unit completions

Takt time is available time divided by what?

A Number of workers
B Machine count
C Batch size
D Customer demand

Line balancing assigns work to stations within what target?

A Cycle time
B Inventory turnover
C Lead time
D Inspection limit

The bottleneck station determines what line rate?

A Maximum throughput
B Minimum quality
C Material density
D Tool hardness

Utilization compares busy time with what?

A Lead time
B Cycle time only
C Available time
D Demand forecast

Overall equipment effectiveness combines availability, performance and what?

A Quality
B Inventory
C Safety stock
D Setup cost

A process layout groups equipment by what?

A Product sequence
B Similar function
C Customer type
D Worker height

A product layout follows what arrangement?

A Machine family
B Operation sequence
C Department budget
D Random routing

A fixed-position layout keeps what stationary?

A Workers
B Tools
C Material handling equipment
D Product

Material handling aims to move material safely and how?

A With maximum distance
B Without layout planning
C Efficiently
D Only by hand

A conveyor provides what material-flow characteristic?

A Continuous movement
B Random storage
C Manual lifting only
D Zero energy use

5S begins with which workplace step?

A Standardize
B Sustain
C Shine
D Sort