What information can a three-dimensional mine block model store?
A Worker shift rosters
B Regional export prices
C Estimated grade and tonnage
D Monthly metal sales
Answer: C. Estimated grade and tonnage. A block model divides a deposit into small cells and assigns estimated geological and grade information to support planning.
Near an active bench, what does grade-control sampling help distinguish?
A Ore from waste
B Metal from slag
C Water from fuel
D Road from rail
Answer: A. Ore from waste. Close-spaced production samples help operators direct material to the plant or to a waste destination.
If waste rock mixes with mined ore, what is this called?
A Reclamation
B Comminution
C Reconciliation
D Dilution
Answer: D. Dilution. Dilution adds non-ore material to the mined ore stream and usually lowers its average feed grade.
What is ore loss during extraction?
A Excess process water
B Valuable ore left behind
C Unstable waste piles
D Extra haul distance
Answer: B. Valuable ore left behind. Ore loss is valuable material that is not recovered from the deposit during mining.
A pit removes 6 million tonnes of waste for 2 million tonnes of ore. What is its strip ratio?
A 1:3
B 2:1
C 8:1
D 3:1
Answer: D. 3:1. Strip ratio compares waste removed with ore recovered; six divided by two gives three tonnes of waste per tonne of ore.
If plant recovery falls while all other factors stay constant, what happens to payable metal per tonne mined?
A It decreases
B It doubles
C It stays fixed
D It becomes waste
Answer: A. It decreases. A lower recovery percentage means a smaller share of contained metal reaches the saleable product.
Why is blast fragmentation measured before ore reaches the plant?
A Set export tariffs
B Predict crusher feed size
C Estimate worker ages
D Map regional rainfall
Answer: B. Predict crusher feed size. Fragment size affects loading and the energy and capacity needed in downstream crushing and grinding.
In a blast layout, what does burden usually measure?
A Shaft to surface
B Ore to tailings
C Hole to free face
D Truck to shovel
Answer: C. Hole to free face. Burden is the distance from a blast hole to the nearest free face, a key spacing in blast design.
Why blend ore from different working areas before processing?
A Steady plant feed
B Increase waste volume
C Change mineral names
D Avoid grade sampling
Answer: A. Steady plant feed. Blending can reduce short-term variation in feed grade or mineral properties entering a processing plant.
What does a mine production schedule specify?
A Where cities expand
B Which tariffs apply
C How rivers flow
D When and how much
Answer: D. When and how much. A schedule sets the timing and quantity of mining and processing within operational constraints.
What can steep haul-road gradients increase?
A Ore purity
B Rainfall totals
C Fuel and tire wear
D Mineral hardness
Answer: C. Fuel and tire wear. Steep grades can increase vehicle power demand, braking demands, and wear on haulage equipment.
Why place backfill in a mined underground stope?
A Raise ore grade
B Support the opening
C Create a new vein
D Measure water chemistry
Answer: B. Support the opening. Backfill can provide ground support and may enable safer extraction of nearby ore, depending on the design.
A plant treats 1,000 tonnes grading 2% copper at 80% recovery. How much copper is recovered?
A 8 tonnes
B 20 tonnes
C 16 tonnes
D 80 tonnes
Answer: C. 16 tonnes. The feed contains 20 tonnes of copper; recovering 80 percent yields 16 tonnes.
What does crusher throughput measure?
A Metal price per tonne
B Ore depth below sea level
C Waste per worker
D Tonnes processed per hour
Answer: D. Tonnes processed per hour. Throughput is the amount of material a processing unit handles during a stated time period.
Which activities does mine-to-mill planning coordinate?
A Blasting and processing
B Trade and migration
C Forestry and fishing
D Mapping and taxation
Answer: A. Blasting and processing. Mine-to-mill work links extraction practices, such as blast fragmentation, with downstream plant performance.
What does monthly production reconciliation compare?
A Imports and exports
B Planned and mined results
C Rainfall and temperature
D Wages and tax rates
Answer: B. Planned and mined results. Reconciliation checks predicted tonnage and grade against surveyed and sampled production results to locate differences.
Why use a tonnage-weighted average grade for several ore blocks?
A Removes all uncertainty
B Ignores ore quantities
C Measures road length
D Accounts for block sizes
Answer: D. Accounts for block sizes. A tonnage-weighted grade gives larger blocks proportionate influence instead of treating every block as equal mass.
Which tool can remotely track movement on an open-pit wall?
A Core barrel
B Flotation cell
C Slope radar
D Ventilation fan
Answer: C. Slope radar. Slope-monitoring radar measures small changes in wall position over time to help identify movement trends.
What does scaling remove from a mine wall?
A Loose unstable rock
B Ore minerals only
C Groundwater salts
D Conveyor dust
Answer: A. Loose unstable rock. Scaling removes loose rock from exposed surfaces to reduce the chance of falling material in work areas.
Why is a safety berm built along a haul-road edge?
A Increase ore grade
B Help contain vehicles
C Store blast holes
D Drain tailings
Answer: B. Help contain vehicles. A berm provides a physical edge barrier intended to reduce the consequences of a vehicle leaving the road.
If haul trucks queue at a shovel, which unit may be limiting output?
A Survey station
B Loading unit
C Tailings pond
D Water well
Answer: B. Loading unit. A persistent queue at the loading point can indicate that loading capacity is limiting truck movement.
What can truck cycle-time records help locate?
A Ore mineralogy
B Deposit age
C Haulage delays
D Country borders
Answer: C. Haulage delays. Cycle-time records break a haul trip into stages and can show where avoidable delays occur.
Why use switchbacks on a steep mine haul route?
A Raise cut-off grades
B Increase bench heights
C Shorten ore bodies
D Reduce road gradients
Answer: D. Reduce road gradients. A switchback lengthens the route so vehicles can climb or descend at a more manageable gradient.
What is stope overbreak?
A Rock beyond planned limits
B Ore below cutoff
C Water above a level
D Waste under a stockpile
Answer: A. Rock beyond planned limits. Overbreak occurs when excavation extends beyond the designed boundary, potentially adding dilution or ground-control costs.
What is stope underbreak?
A Extra waste outside limits
B Processed tailings
C Excess road gradient
D Rock left inside limits
Answer: D. Rock left inside limits. Underbreak means planned material remains unmined within the intended excavation boundary.