Difficulty: Hard
Suppose one supplier provides most critical components from a flood-prone site. Which response most directly reduces concentration risk?
A Qualify an independent alternate source
B Shorten the sales forecast
C Increase reorder paperwork
D Expand finished-goods labels
Answer: A. Qualify an independent alternate source. An independent source reduces dependence on one exposed supplier.
How should planners treat correlated supplier risks?
A Assume independent failures always
B Count supplier names only
C Model shared disruption exposure
D Ignore common locations
Answer: C. Model shared disruption exposure. Common hazards can disrupt multiple suppliers simultaneously.
When lead-time demand is uncertain, which reorder logic is robust?
A Lead-time demand plus safety stock
B Supplier count times price
C Annual sales plus payable days
D Average stock minus returns
Answer: A. Lead-time demand plus safety stock. Reorder point combines expected demand during lead time and a variability buffer.
What does a high forecast bias with low error variance suggest?
A Consistent directional forecast error
B Perfect forecast calibration
C Accurate inventory records
D Random one-time shortage
Answer: A. Consistent directional forecast error. Persistent bias means forecasts systematically overshoot or undershoot.
Why can a high fill rate coexist with poor on-time delivery?
A Both metrics are identical
B Fill rate measures delivery timing
C Complete but late orders
D Stock never affects fulfillment
Answer: C. Complete but late orders. Fill rate focuses on quantity availability, while on-time measures timing.
Which control helps prevent duplicate supplier payments?
A Ignore repeated invoice numbers
B Match invoice, receipt, and order
C Remove supplier identifiers
D Approve all invoices automatically
Answer: B. Match invoice, receipt, and order. Three-way matching checks purchase order, receipt, and invoice records.
Promotional orders surge above actual sales. Which upstream effect may follow?
A Bullwhip amplification
B Lower forecast error
C Reduced demand variance
D Perfect order fulfillment
Answer: A. Bullwhip amplification. Order batches and distorted signals can amplify upstream variability.
How can a multi-echelon inventory policy improve placement?
A Hold all stock at retail
B Eliminate regional demand
C Ignore replenishment lead times
D Position buffers across network stages
Answer: D. Position buffers across network stages. Multi-echelon policy places inventory across connected locations based on service and cost.
What is the risk of optimizing one supplier’s price alone?
A Order cycle time vanishes
B Total landed cost may rise
C Quality controls become irrelevant
D Demand becomes certain
Answer: B. Total landed cost may rise. Purchase price omits freight, duties, quality, handling, and risk costs.
Which analysis tests stock policy under uncertain demand scenarios?
A Cycle counting
B ABC classification
C Invoice matching
D Monte Carlo simulation
Answer: D. Monte Carlo simulation. Simulation evaluates outcomes across many possible demand or supply scenarios.
Why keep a risk register for supply chains?
A Guarantee no disruption
B Replace supplier contracts
C Store only invoice totals
D Track risks, owners, and responses
Answer: D. Track risks, owners, and responses. A risk register records exposures, accountable owners, and mitigation actions.
How can postponement reduce obsolescence exposure?
A Accelerate every purchase
B Delay final product commitment
C Remove demand sensing
D Increase early finished-goods builds
Answer: B. Delay final product commitment. Delaying differentiation keeps inventory flexible until demand is clearer.
Which case best illustrates a bottleneck constraint?
A One constraint limits throughput
B Orders arrive as planned
C All stations have excess capacity
D Inventory is evenly spread
Answer: A. One constraint limits throughput. A bottleneck limits throughput for the whole process.
What should a resilience plan test after a disruption?
A Recovery time and alternate routes
B Marketing clicks and impressions
C Staff vacation preferences
D Website page speed
Answer: A. Recovery time and alternate routes. Recovery exercises evaluate how operations restore and reroute supply.
When should a company use dual sourcing?
A Only when demand is zero
B To avoid supplier assessment
C High risk justifies added complexity
D Every low-value item automatically
Answer: C. High risk justifies added complexity. Dual sourcing can reduce dependence but adds qualification and coordination costs.
Which metric exposes poor delivery reliability despite low cost?
A Purchase price variance
B Warehouse area
C Inventory value
D On-time delivery rate
Answer: D. On-time delivery rate. Reliability metrics should complement cost metrics on a balanced scorecard.
How can sustainability be included in supplier selection?
A Ignore material origin
B Evaluate environmental and social criteria
C Select lowest price only
D Remove supplier audits
Answer: B. Evaluate environmental and social criteria. Sustainable procurement includes environmental and social considerations.
Which traceability design supports rapid targeted recalls?
A Use warehouse labels without records
B Keep unstructured email threads
C Link lot IDs across events
D Store product names only
Answer: C. Link lot IDs across events. Linking identifiers to events helps determine affected products and destinations.
What does route optimization need to respect?
A Staff training records
B Product margins only
C Capacity, time windows, and stops
D Customer survey scores
Answer: C. Capacity, time windows, and stops. Routing decisions must satisfy operational constraints such as capacity and delivery windows.
Why can obsolete inventory increase after a forecast shift?
A Suppliers always stop shipping
B Warehouse labels change color
C Stock no longer matches demand
D Lead times become negative
Answer: C. Stock no longer matches demand. Forecast changes can leave stock aligned to outdated demand.
Which policy best balances service and carrying cost?
A Minimize every SKU equally
B Keep unlimited safety stock
C Apply one maximum to everything
D Set differentiated targets by item
Answer: D. Set differentiated targets by item. Item criticality, variability, and economics support differentiated service policies.
How should a stockout exception be handled in an allocation system?
A Allocate randomly without records
B Prioritize by agreed business rules
C Ship unapproved substitutes
D Hide demand from planners
Answer: B. Prioritize by agreed business rules. Transparent allocation rules manage constrained stock consistently.
What is a key tradeoff in centralized inventory?
A Forecast accuracy versus barcode size
B Supplier quality versus product design
C Lead time versus customer data
D Pooling benefit versus response distance
Answer: D. Pooling benefit versus response distance. Centralization pools stock but may increase response time or transport distance.
Why audit master data before supply planning?
A It guarantees perfect forecasts
B Bad inputs distort replenishment recommendations
C It replaces supplier collaboration
D It removes demand uncertainty
Answer: B. Bad inputs distort replenishment recommendations. Planning depends on accurate item, lead-time, BOM, and sourcing data.
What signals a supply chain control tower is effective?
A Faster exception response with visibility
B Fewer supplier records
C More dashboards without action
D Higher stock in every location
Answer: A. Faster exception response with visibility. Value comes from actionable visibility and coordinated decisions, not display volume.