Risk Management MCQs (Set-4)

Difficulty: Hard

Two risks share one power grid; what analytical issue deserves attention?

A Independent sampling
B Brand dilution
C Patent exhaustion
D Common cause failure

When modeling a vendor outage, what is missing if the cloud provider is ignored?

A Brand positioning
B Copyright notice
C Dependency mapping
D Sales incentive

After a contract transfers loss costs, what may remain untransferred?

A No remaining risk
B Operational exposure
C Trademark rights
D Patent ownership

What failed when a risk owner exceeded tolerance without escalation?

A Governance threshold
B Insurance limit
C Sales forecast
D Product warranty

How could a backup fail despite sharing the primary site’s power?

A Lower patent term
B Trademark conflict
C Lower deductible
D Shared failure point

What weakness comes from modeling only one worst-case story?

A Perfect forecasting
B Automatic transfer
C Single-scenario bias
D Certain likelihood

When several risks could compound, which method explores combined effects?

A Simple checklist
B Integrated scenario analysis
C Logo comparison
D Staff survey

Even with cyber insurance, what flaw remains if authentication is weak?

A Control substitution
B Risk avoidance
C Risk diversification
D Risk appetite

Which plan element is missing when a fast-growing firm has no incident roles?

A Premium schedule
B Trademark class
C Patent claim
D Crisis governance

Without a continuity exercise, what readiness claim lacks support?

A Policy ownership
B Market growth
C Practical readiness
D Patent novelty

Recovery takes six hours against a two-hour target; which measure is missed?

A Recovery point objective
B Recovery time objective
C Policy limit
D Risk appetite

When a database backup loses one day, which metric captures the loss?

A Recovery point objective
B Recovery time objective
C Risk tolerance
D Insurance limit

How can an attacker using a vendor’s account reach the business?

A Natural hazard
B Product liability
C Currency exposure
D Third-party access

After accepting residual risk, what should a company keep monitoring?

A Only annual revenue
B Brand colors
C Changing conditions
D Old advertisements

What wider exposure can arise when one region supplies a critical component?

A Copyright transfer
B Geographic concentration
C Trademark dilution
D Patent term

When a risk matrix scores different profiles alike, what should reviewers add?

A Context and judgment
B More decimal places
C Automatic acceptance
D Fewer owners

Why may one control fail to fit every risk?

A All risks vanish
B Premiums become fixed
C Exposure is transferred
D Control may not fit

Near misses cause no loss but reveal weakness; what should the team do?

A Discard the report
B Reward silence
C Capture and investigate
D Close the risk

Which evidence supports a supplier’s uptime promise?

A Brand style guide
B Test results
C Patent disclosure
D Tax certificate

At a service launch with unfamiliar rules, what response fits initially?

A Legal review and monitoring
B Automatic launch
C Ignore requirements
D Delete records

If a risk action is overdue, what should the owner do?

A Erase the risk
B Claim completion
C Hide the delay
D Escalate and replan

What should an insurer’s denial under an exclusion teach a buyer?

A Assume future payment
B Remove all controls
C Review wording before binding
D Ignore exclusions

A startup sets a maximum acceptable outage; what is this boundary?

A Patent priority
B Risk tolerance
C Trademark class
D Deductible

Why does hiding a control failure endanger governance?

A Risk oversight integrity
B Product color
C Patent term
D Brand recall

Which management cycle tracks warning signs and updates responses?

A Ongoing monitoring
B One-time assessment
C Automatic insurance
D Risk concealment