Operations Planning MCQs (Set-4)

Difficulty: Hard

A firm depends on one supplier for a critical component with long lead times. What is the strongest resilience step?

A Develop a qualified alternative
B Order without records
C Ignore lead time
D Remove quality checks

A business has excess inventory and frequent stockouts at once. What should it analyze?

A Only total inventory value
B Item level demand and replenishment
C Logo preference
D Tax structure

A process meets its speed target but defect rates are rising. What should management prioritize?

A Increase speed further
B Ignore inspection data
C Remove worker training
D Balance throughput with quality

A new control reduces one hazard but creates another. What should happen?

A Assume the control is safe
B Assess unintended hazards
C Stop all reporting
D Ignore worker feedback

A company faces a power outage during an overnight shift. What planning gap may be exposed?

A Emergency roles and backup process
B Customer age data
C Logo sizing
D Marketing budget

Workers repeatedly bypass a procedure because it is impractical. What is a useful response?

A Review it with workers
B Punish without investigation
C Ignore the reports
D Delete all procedures

A small operation must choose between capacity expansion and process improvement. What should it measure first?

A Company colors
B Founder hobbies
C Tax deadlines
D Bottlenecks and demand

A supplier’s low price comes with unpredictable delivery. What should sourcing compare?

A Only unit price
B Only logo
C Total cost and reliability
D Only invoice color

A firm has no records of machine downtime. What cannot be assessed well?

A Reliability patterns
B Brand recognition
C Customer age
D Ownership percentage

A hazard inspection finds several issues with different severity and exposure. What should guide priority?

A The order reported
B The easiest fix
C Risk ranking
D The newest hazard

A business is growing, but its original floor layout causes cross traffic. What should be redesigned?

A Company logo
B Flow of people and materials
C Tax form
D Staff birthdays

A firm outsources delivery but receives repeated damage claims. What should be established?

A Service standards and monitoring
B A new slogan
C More unrelated ads
D Less recordkeeping

A team wants to improve cycle time but lacks baseline data. What should it do first?

A Measure the current process
B Change every step
C Buy new equipment immediately
D Assume delays are gone

A new product changes equipment setup requirements. What must operations update?

A The company name
B The marketing colors
C Only the annual report
D Procedures and worker training

A business’s emergency plan exists but assigns no owner. What is missing?

A A logo
B Clear responsibility
C A budget
D A customer survey

A firm experiences late orders after expanding to a new region. What should it revisit?

A Regional capacity and logistics
B The original logo
C Founder biography
D Staff vacation policy

A maintenance control is scheduled but repeatedly skipped. What should management improve?

A Brand awareness
B Market size
C Customer surveys
D Accountability and tracking

A warehouse’s inventory record is accurate, but picking errors remain high. What should be examined?

A Tax returns
B Staff birthdays
C Picking process and layout
D Company slogan

A small business faces a hazardous task performed infrequently. What should be planned?

A A marketing campaign
B Safe nonroutine work procedures
C A new logo
D A staff party

A firm has limited storage and uncertain delivery timing. What is a sound inventory response?

A Order the maximum always
B Stop tracking stock
C Balance buffer stock and space
D Ignore supplier timing

A customer experience depends on returns, but the return workflow is unclear. What should be documented?

A Logo size
B Market share
C Steps and ownership
D Tax rate

A company introduces new machinery. What operation review is essential?

A Only product color
B Only advertising channel
C Training, hazards, and maintenance
D Only staff titles

A process improvement saves time but increases worker exposure to a hazard. What should happen?

A Keep the speed gain
B Hide the hazard
C Remove safety checks
D Redesign for safe performance

A service team has high capacity on paper but frequent missed appointments. What should be measured?

A Logo awareness
B Tax filing time
C Customer birthdays
D Actual utilization and workflow

A company updates its process but never verifies whether results improved. What is missing?

A A new slogan
B Follow up measurement
C More office signs
D A brand refresh