Natural Hazards in India MCQs (Set-3)

Difficulty: Medium

A multi-day storm drops heavy rain over a saturated river basin. Which outcome is most likely?

A A drought caused by soil moisture loss
B High river discharge and possible overbank flooding
C An avalanche on a snow-free plain
D A tsunami generated by a sea-floor rupture

A city’s paved streets flood after a cloudburst, while nearby farmland drains more slowly. Which factor best explains the difference?

A A lower population count in the city
B The city’s greater soil permeability
C A higher altitude at the river mouth
D Impervious urban surfaces and limited drainage

A settlement expands into a river’s natural floodplain. Which part of flood risk has most directly increased?

A Exposure of people and property
B The probability of every storm occurring
C The height of the surrounding mountains
D The annual number of earthquakes

A district records a large rainfall deficit over the monsoon season. Which hazard indicator is directly observed?

A Agricultural drought only
B A hydrological flood
C Meteorological drought
D A storm surge

A reservoir has adequate water, but crops fail because the root zone remains too dry. Which impact is being described?

A A tsunami
B A riverine flood
C An avalanche
D Agricultural drought

Streams and reservoirs in a region stay unusually low after several dry seasons. Which drought condition is most evident?

A A cyclone-induced surge
B Hydrological drought
C An earthquake aftershock
D A flash flood

A school in an earthquake-prone district is retrofitted with safer structural supports. Which approach is this?

A Post-event damage assessment
B Cyclone forecasting
C Structural mitigation
D Floodplain encroachment

Residents feel a long earthquake near an offshore trench, followed by rapid sea-level withdrawal. What should authorities assess first?

A A possible tsunami threat and immediate official warnings
B A seasonal agricultural drought
C An inland snow avalanche
D A lowland dust storm

A long tsunami wave crosses the open ocean and becomes much taller near a shallow coast. Which process helps explain the change?

A The wave turns into an astronomical tide
B The sea floor stops displacing water everywhere
C The wave slows in shallow water and can build up toward the coast
D The coastline removes the wave energy completely

A cyclone forms in the Bay of Bengal and moves westward toward Odisha. Which coastline is in the main landfall corridor?

A India’s eastern coast
B The Himalayan foothills
C The Punjab plains
D The Rann of Kachchh only

A coastal gauge shows water far above the predicted astronomical tide as a cyclone approaches. What hazard is likely occurring?

A Hydrological drought
B Ground shaking
C A GLOF
D Storm surge

A coastal district receives a cyclone warning that forecasts dangerous surge before midnight. Which action should be prioritized?

A Wait until the surge reaches homes before moving
B Evacuate people from low-lying areas to designated shelters before conditions worsen
C Send residents to the beach to confirm the forecast
D Keep shelters closed until the cyclone eye arrives

A road project cuts away the toe of a steep, rain-soaked slope. Which hazard is increased?

A Slope failure or landslide
B Tsunami
C Astronomical tide
D Meteorological drought

A fast-moving mass of snow descends a steep mountain chute. Which process does this describe?

A A debris-free river flood
B A storm surge
C A seismic intensity scale
D An avalanche

A high-altitude lake’s moraine barrier fails and a surge races down a valley. What is the event called?

A A meteorological drought
B A glacial lake outburst flood
C An urban flash tide
D A storm-surge warning

The same cyclone passes two coastal towns, but one has stronger buildings and clear evacuation routes. Why may its losses be lower there?

A The cyclone’s hazard disappears over that town
B Strong buildings reduce the cyclone’s wind speed
C Lower vulnerability and better preparedness reduce the consequences
D The town’s position changes the ocean basin

Which combination gives the most complete basic assessment of a community’s disaster risk?

A Hazard information, exposed people/assets and vulnerability
B Annual rainfall, language groups and road colour
C Only the event’s maximum intensity
D Only the number of hospitals outside the district

A municipality overlays flood depth, population, schools and hospitals on one map. What is the main planning benefit?

A It can eliminate the physical possibility of rainfall
B It can identify high-exposure areas for targeted risk reduction
C It can predict the exact time every person will move
D It can replace all drainage infrastructure

A town repeatedly floods because houses block drainage channels and occupy low-lying land. Which planning response addresses both causes?

A Build more homes in drainage channels
B Remove all river gauges
C Replace flood warnings with earthquake drills
D Protect drainage routes and guide new development away from high-risk lowlands

A drought-prone village wants to improve dry-season water availability over several years. Which measure is most relevant?

A Constructing a cyclone shelter inland
B Deepening a river channel only after floods
C Watershed management and rainwater harvesting
D Building on a steep unstable slope

Residents notice new ground cracks and tilting trees above a road cut after heavy rain. What should local officials infer?

A An approaching tsunami generated by the road
B Possible slope instability that merits assessment and precaution
C A guaranteed earthquake of magnitude 8
D Evidence that the hillside is permanently stable

A planner sees a map marked Zone V for a proposed public building. Which implication is most appropriate?

A Earthquakes cannot occur there
B Flood risk is necessarily the highest of all hazards
C Only temporary structures are allowed by the map
D The design should account for the highest seismic shaking category

Which locations form a credible Indian earthquake-hazard focus?

A The Himalaya, Northeast, Kachchh and Andaman–Nicobar region
B Only the eastern coastal delta
C Only the Punjab–Haryana plain
D All places at the same risk level

A cyclone brings intense rain to an inland district after landfall. Which secondary hazard can follow?

A A sea-floor tsunami in every case
B An avalanche in a tropical plain
C River or urban flooding
D Permanent meteorological drought

Why is a multi-hazard map useful for a Himalayan district?

A It assumes each hazard occurs only at the coast
B It removes the need to understand local terrain
C It can show overlapping earthquake, landslide, flood and avalanche concerns
D It can depict only one administrative boundary