WhatsApp
Skip to content
Before excavation
- Excavation follows a research design, permissions and a plan for recording, conservation and long-term care.
- Survey and mapping establish site boundaries and guide where, or whether, to dig.
- Excavation is destructive: removed layers cannot be put back in their original condition.
Stratigraphic approach
- Deposits are excavated by identifiable contexts and stratigraphic relationships rather than arbitrary digging alone.
- The law of superposition generally places undisturbed lower layers earlier than layers above them.
- Cuts, fills and disturbances must be recognized because they can interrupt a simple layer sequence.
Tools and sampling
- Trowels, brushes and small tools allow careful removal near delicate features; larger tools may be used in suitable deposits.
- Sieving recovers small finds; flotation separates light botanical remains from soil.
- Samples should be taken systematically and labeled with context, location and purpose.
Recording in the field
- Each context is described, numbered, photographed and located in plans or section drawings.
- Finds are labeled with their provenience so laboratory results can be linked back to the site.
- Daily records, condition notes and secure storage reduce loss and confusion.
Safety and care
- Field teams assess structural, environmental and contamination hazards before work.
- Fragile objects may need stabilization by trained conservators before lifting.
- Excavation should stop or change when new evidence, safety concerns or community priorities require it.