Which sequence describes operations as a transformation system?
A Customers, profits, taxes
B Plans, budgets, audits
C Prices, sales, dividends
D Inputs, process, outputs
Answer: D. Inputs, process, outputs Operations transform inputs such as materials, labor, and capital through a process into goods or services.
What do operations managers primarily coordinate?
A Tax returns and audits
B Resources and work processes
C Investor votes and dividends
D Brand slogans and campaigns
Answer: B. Resources and work processes Operations managers coordinate people, materials, equipment, and processes to deliver products or services.
Which decision belongs in production planning?
A Where and how work happens
B Which tax rate applies
C Which logo customers prefer
D How dividends are distributed
Answer: A. Where and how work happens Production planning determines how and where work will be performed and what resources are needed.
What is the main purpose of quality control?
A Increase every product feature
B Eliminate customer feedback
C Meet defined quality standards
D Maximize inventory levels
Answer: C. Meet defined quality standards Quality control compares outputs with defined standards and supports corrective action.
Which measure compares actual output with design capacity?
A Market penetration
B Labor turnover
C Inventory turnover
D Capacity utilization
Answer: D. Capacity utilization Capacity utilization expresses the share of design capacity that is actually used.
What usually limits a processβs maximum throughput?
A Value stream
B Bottleneck
C Work instruction
D Safety stock
Answer: B. Bottleneck A bottleneck is the constrained step that limits the output rate of the overall process.
For a high-volume standardized product, which layout often fits?
A Product layout
B Fixed-position layout
C Process layout
D Office layout
Answer: A. Product layout Product layouts arrange workstations in the sequence needed for a standardized, high-volume flow.
Which factor belongs in a facility-location decision?
A Brand color palette
B Quarterly dividend policy
C Access to suppliers and customers
D Employee appraisal frequency
Answer: C. Access to suppliers and customers Location decisions consider access to inputs, labor, customers, and transportation.
When is a process layout often useful?
A Continuous chemical flow
B One repeated assembly line
C Single standardized service
D Low-volume varied work
Answer: D. Low-volume varied work Process layouts group similar resources and suit varied work with lower volumes.
What can distinguish many services from manufactured goods?
A Services always need warehouses
B Production and use may coincide
C Goods cannot be inspected
D Services require no labor
Answer: B. Production and use may coincide Many services are produced and consumed at the same time, making customer contact part of operations.
Why do operations teams use forecasts?
A Estimate future demand
B Measure past quality only
C Choose a company name
D Set employee pension terms
Answer: A. Estimate future demand Demand forecasts help operations plan capacity, materials, staffing, and schedules.
What does aggregate planning balance?
A Audits, hiring, promotions
B Branding, pricing, advertising
C Workforce, output, inventory
D Taxes, dividends, borrowing
Answer: C. Workforce, output, inventory Aggregate planning balances expected demand with production rates, workforce levels, and inventory over a medium-term horizon.
What does production routing specify?
A Customer payment terms
B Employee benefit levels
C Supplier ownership
D Sequence of work steps
Answer: D. Sequence of work steps Routing identifies the path or sequence through which work moves.
Which tool displays project tasks against a timeline?
A Control chart
B Gantt chart
C Pareto table
D Fishbone diagram
Answer: B. Gantt chart A Gantt chart displays activities on a timeline and can show planned duration and progress.
Which method identifies the longest dependent task path?
A Critical path method
B Statistical process control
C ABC inventory analysis
D Value stream mapping
Answer: A. Critical path method The critical path method identifies the longest chain of dependent activities that determines the earliest project finish.
Why track float in a project schedule?
A Increase task costs
B Set supplier prices
C Find delay without finish impact
D Measure product defects
Answer: C. Find delay without finish impact Float indicates how long an activity can be delayed without delaying a dependent milestone or project completion.
How does PERT help with uncertain activity times?
A Sets fixed labor rates
B Counts customer complaints
C Eliminates task dependencies
D Uses optimistic, likely, pessimistic estimates
Answer: D. Uses optimistic, likely, pessimistic estimates PERT uses three time estimates to account for uncertainty when estimating project activity duration.
Why do firms hold inventory?
A Avoid forecasting
B Meet demand between replenishments
C Replace quality standards
D Increase process steps
Answer: B. Meet demand between replenishments Inventory can buffer the time between replenishment and customer or production demand.
What should a reorder point account for?
A Usage during supplier lead time
B Annual appraisal dates
C Product advertising reach
D Quarterly profit targets
Answer: A. Usage during supplier lead time A reorder point should trigger replenishment early enough to cover demand during lead time.
Why keep safety stock?
A Avoid supplier communication
B Replace cycle counting
C Buffer demand or supply uncertainty
D Increase storage indefinitely
Answer: C. Buffer demand or supply uncertainty Safety stock is an extra buffer against uncertainty in demand or replenishment.
What does ABC inventory analysis prioritize?
A Products by color
B Workers by seniority
C Suppliers by location
D Items by annual usage value
Answer: D. Items by annual usage value ABC analysis groups inventory by the relative value of annual usage, helping focus control effort.
What does material requirements planning calculate?
A Customer satisfaction scores
B Component quantities and timing
C Employee performance ratings
D Product advertising budgets
Answer: B. Component quantities and timing MRP calculates the materials and timing needed to support a production schedule.
When should a just-in-time system receive materials?
A When production needs them
B Only after final inspection
C Before demand is forecast
D At each year’s start
Answer: A. When production needs them Just-in-time replenishment seeks to have materials arrive near when they are needed, reducing inventory holding.
Which practice is central to lean operations?
A Repeat unnecessary inspections
B Add extra approvals
C Remove non-value-added work
D Build excess inventory
Answer: C. Remove non-value-added work Lean improves flow by removing steps that do not add value for the customer.
What does a value stream map help teams see?
A Employee promotion history
B Quarterly financial statements
C Brand awareness by region
D Flow from supplier to customer
Answer: D. Flow from supplier to customer Value stream mapping visualizes the flow of materials and information through a process.
Which path is included in a supply chain?
A Only advertising and sales
B Inputs through customer delivery
C Only final product storage
D Only internal payroll approvals
Answer: B. Inputs through customer delivery A supply chain links sourcing, production, and delivery to the customer.