Time and Work: Basic Arithmetic and Mathematics Study Guide

Aptitude and Reasoning · Basic Arithmetic and Mathematics

Time and Work

Time-and-work problems compare output rates. Combined workers' rates add when they work simultaneously on the same job.

Introduction

Time-and-work problems compare output rates. Combined workers' rates add when they work simultaneously on the same job.

Key idea: Add rates for simultaneous work; add times only for sequential stages.

Represent Work as a Rate

  1. One complete job is the unit

    If A finishes in 12 days, A's rate is 1/12 job per day.

  2. Combine simultaneous rates

    If A and B take a and b days, their joint rate is 1/a+1/b; completion time is its reciprocal.

Changing Teams and Efficiencies

  1. Use a common work total

    Choose a convenient total divisible by individual times, then express each worker's daily output in units.

  2. Split the timeline

    When people join or leave, calculate each stage's completed work separately and subtract from the total.

Contribution and Wages

  1. Efficiency and time

    For the same job, doubled constant efficiency halves completion time.

  2. Pay by work done

    Wages shared by contribution should follow each worker's output, not just time present.

Conclusion

Model each person by work completed per unit time, then track output over each stage. This handles unequal capacity and changing teams.