Inlet
- A pipe filling a tank in x hours adds 1/x tank per hour.
Outlet
- Treat an emptying rate as negative.
Net Rate
- Add inlet rates and subtract outlet rates.
Time
- Time to fill = remaining capacity ÷ positive net filling rate.
Balance
- Equal filling and draining rates leave the water level unchanged.
Leakage
- Leakage rate equals gross inlet rate minus observed net filling rate.
Partial Operation
- Calculate each stage separately when pipes operate for different intervals.
Capacity Limits